TheExperts™ Talk to us

Power plant & central plant management

Your plant isn't broken.
It's expensive.

Power plants and central plants get run to keep the complaints down — not to control what they cost. Nobody's job is tied to the budget the plant consumes, and deferred decisions quietly become capital emergencies.

We find that gap, put a dollar figure on every piece of it, and hand you the roadmap to take it back.

Thermal load · 8,760 hrs Annual
As it runs As it could run The gap

Illustrative. Every EMP™ builds this curve from your actual meter, fuel and maintenance records — then prices each hour of it.

$12.7M+Annual operating savings across the portfolio
$143M+Owner capital preserved
70,000+New Yorkers served by these plants
39 MWOptimized across three islanded microgrids

The real issue

Most plants aren't under-equipped.
They're under-understood.

The biggest opportunity in an existing utility plant is almost never found in replacing equipment. It's found in understanding how the whole system actually operates — how load moves through it, what each hour costs, and which decisions are quietly compounding.

Traditional engineering firms start with a replacement list. We start with three years of your data and thirty years of running plants like yours. In that time we have never seen a fully optimized plant.

The math

$100K $1M – $6M/yr

Typical annual value identified per plant. We don't take an engagement unless we see a path to at least five times our cost.

The portfolio

The work, by asset type.

Three kinds of asset, three different problems, one method. Pick the one that looks like yours.

Generating assets, where the measure is EBITDA, debt service coverage and what the plant is worth at exit. Outage execution and turbine condition drive most of it.

Detroit Renewable Power

Detroit, MI · 65 MW GE steam turbine

Carried the major load for Detroit's city steam system

+12%More MW from the same turbine
$1.6MAdded revenue per year
−85%Hydrogen consumption
+50Klb/hr additional steam sendout

A 65 MW turbine pushing up to 500,000 lb/hr of steam into a city district system, poorly maintained, with almost no documentation left behind by previous owners. We wrote the repair specification, ran a competitive bid evaluation across three turbine vendors, gap-analysed the plant's spares against what the outage would actually need, and trained the operations and maintenance departments on their own machine before anyone opened a casing.

When it came apart, the turbine had thrown a blade on the eleventh stage and lost a shroud on the fourth — neither of which anyone knew. Blades were reverse-engineered and manufactured while the rotor was in Houston. We also found the machine sitting ten mils low to the generator when it should have been ten mils high, and hydrogen seals bottoming out on the outer race so the inner rings could never float. That last finding is where the 85% hydrogen reduction came from: nobody had been hunting a leak, because nobody had established what normal looked like.

Repair spec written in-house · Competitive bid evaluation · ~$250K spares sourced against gap analysis · Controls and exciter modernization

Also in this category: emergency response for a Long Island City generating station, and gas turbine inlet air cooling at Brooklyn Navy Yard — both under our founder, detailed below.

Where the method was built

Three decades before the four campuses.

The NYC portfolio is where our founder's method was proven at scale. These are the plants where it was learned — hospitals, universities, refineries, service academies and generating stations, going back thirty years.

Princeton University80,000 lb economizer rigged into a live energy plant with inches of clearance and no shutdown.Ivy League · Campus energy plant
Johns Hopkins UniversityCharles Commons — chilled water delivered 15 weeks early, hot water 13 weeks early, after the incumbent fell behind.University · Two 13-storey buildings
Memorial Sloan-KetteringNew steam PRV station installed across four weekend shifts, every weld to x-ray specification.Hospital · As subcontractor
A federal service academyCalled in to accelerate HVAC and piping installation after the mechanical contractor lost the schedule.Federal · Schedule recovery
University of MichiganPerformance testing and diagnosis of a chronically underperforming 220,000 pph superheated steam boiler.University · Subconsultant to RMF Engineering
KeySpan RavenswoodPrimary emergency-response contractor to a Long Island City generating station — on site within hours.Power generation · Emergency response
Detroit Renewable Power65 MW turbine overhaul returning 12% more output and $1.6M a year in additional revenue.Power generation · Outage management
Johnson Matthey75,000 lb waste heat boiler replaced inside the annual outage window, foundation failure and all.Refining · $120K/day downtime cost
EthiconCooling tower, chiller, four pumps and 300 ft of 8-inch pipe — permit to circulating water in five weeks.Medical manufacturing
Domino SugarTank replaced in the field rather than through the building, with no interruption to other processes.Food processing · Yonkers, NY
Brooklyn Navy YardGas turbine inlet air cooling designed and installed to recover summer output losses.Industrial park cogeneration
Cushman & WakefieldBoiler rehabilitation and burner tuning that cut nuisance alarms by 95%.Commercial real estate
The engineers I have shown this to have truly been awed.
Edward T. Borer, PEEnergy Plant Manager
Princeton University · 2010
Choreographed and executed as well planned outages should be.
John M. O'SullivanPresident
Detroit Renewable Power
Our alarms have been cut by 95%.
Robert WhiteOperations Manager
Cushman & Wakefield · 2009

TheExperts Roster™

Fifty-six disciplines. One phone call.

No four people carry every discipline a power plant or central plant needs. TheExperts Roster™ is our vetted network of specialist partners — each one a firm we have worked alongside in real plants, each one holding a defined discipline. When an EMP™ finds a problem, the person who fixes it is already on the roster.

56 shown

Rotating Equipment & Prime Movers

Turbines, generators, motors, pumps and diesel engines — installation, overhaul and field service.

TheTurbineExpert™ Houston, TX — global
TheLM2500Expert™ U.S. — global deployment
TheLM6000Expert™ U.S. — global deployment
TheTurbineControlsExpert™ U.S. — veteran/family-owned
TheGeneratorExpert™ U.S.
TheMotorExpert™ Northeast U.S.
TheDieselExpert™ Global
ThePumpExpert™ U.S. — multi-location

Boilers, Pressure Parts & Combustion

Boiler erection and repair, firetube fabrication, combustion systems and stud welding for outage work.

TheBoilerExpert™ New England
TheBurnerExpert™ U.S.
TheFireTubeExpert™ New York City metro
TheBoilerMakerExpert™ (Rochester) Rochester, NY — multi-state
TheBoilerMakerExpert™ (NYC) Queens, NY — NYC metro
TheStudWeldingExpert™ U.S.

Valves, Piping & Mechanical

Valve service across multiple regional specialists, pipe fitting, expansion joints, insulation and hydraulics.

TheValveExpert™ (Industrial) Regional U.S.
TheValveExpert™ (Control Valves) Mid-Atlantic / Northeast
TheValveExpert™ (Engineered) U.S.
TheValveExpert™ (Automation) U.S.
ThePipeFittingExpert™ (NYC) Queens, NY — NYC metro
ThePipeFittingExpert™ (Rochester) Rochester, NY — multi-state
TheExpansionJointExpert™ U.S.
TheInsulationExpert™ Northeast U.S.
TheHydraulicExpert™ (Full-service) Regional U.S.
TheHydraulicExpert™ (Field Service) Regional U.S.

Steam, Water & Chemistry

Steam plant operations, distribution, traps and water-treatment chemistry.

TheSteamExpert™ U.S. In-house
TheSteamDistributionExpert™ Manhattan / NYC
TheSteamTrapExpert™ Regional U.S.
TheWaterTreatmentExpert™ Richmond, VA — global

Electrical, Controls & Instrumentation

Switchgear and breakers, I&C, DCS and PLC integration, telemetry and electrical engineering.

TheSwitchGearExpert™ (Gulf Coast) Gulf Coast
TheSwitchGearExpert™ (Breakers) U.S. — national
TheSwitchGearExpert™ (Systems) Texas — U.S. and Canada
TheI&CExpert™ U.S.
TheDCSExpert™ Global
ThePLCExpert™ Houston, TX area
TheTelemetryExpert™ Multi-state
TheElectricalEngineeringExpert™ Multi-regional U.S.

Environmental, Emissions & Compliance

Air and water permitting, SCR catalyst systems, environmental advisory and environmental law.

TheEnvironmentalExpert™ (Compliance) New York
TheEnvironmentalExpert™ (Advisory) U.S.
TheCatalystExpert™ U.S.
TheEnvironmentalLawExpert™ U.S. — multi-office

Outage, Inspection & Site Support

Outage management, NDE testing, scaffolding access, chillers and prefabricated modular systems.

TheOutageExpert™ U.S.
TheNDEExpert™ 9 North American locations
TheScaffoldingExpert™ (Engineered Access) North America
TheScaffoldingExpert™ (Global Scale) Global
TheChillerExpert™ NYC metro
ThePreFabExpert™ South Carolina — U.S.

Energy Strategy, Markets & New Build

Power markets, microgrids, solar EPC, equipment rental and large-firm engineering.

ThePowerMarketingExpert™ U.S. In-house
TheMicroGridExpert™ U.S. In-house
TheSolarExpert™ U.S.
TheRentalExpert™ Global
TheEngineeringExpert™ Global

Professional Services & Operations Support

Safety, procurement and rep management, legal agreements, insurance and brand merchandise.

TheSafetyExpert™ U.S.
TheRepExpert™ U.S. In-house
TheAgreementExpert™ Global — multi-office
TheInsuranceExpert™ U.S. — national
TheSwagExpert™ U.S.

Partner firms, named leads, coverage and proof points are provided with the full roster on request — or as part of any EMP™ engagement.

What we do

Three tracks. One method.

Whether it is a campus utility plant, a merchant generating asset, or two hundred boiler rooms across a housing portfolio, the approach is the same: measure it against a written standard, put a dollar figure on every gap, then decide together how far we go.

For power plant owners, private equity sponsors and asset managers. The question here isn't comfort — it's EBITDA, debt service coverage and what the asset is worth at exit. O&M+™ bundles the three things owners need but rarely get together: a diagnostic that finds the money, outage management that protects schedule and budget, and long-term service cover that closes the gaps an OEM agreement leaves open.

15%+EBITDA improvement targeted over three years
$5–15MPer plant, conservatively
10%Outage cost and schedule reduction targeted
3–12%Emissions reduction, typical range

Figures on this track are engagement targets and typical ranges, not results already booked. For work already delivered, see Detroit Renewable Power under Portfolio.

O&M+™ · The bundle

One engagement, three outcomes. Take the diagnostic on its own if you prefer — but the value compounds when outage execution and long-term cover are run against the same set of findings.

Step one · always

OA™

Opportunities Assessment
The diagnostic — always first

  • Current operations compared against our 28-process PowerPlantExcellence™ standard
  • Every finding becomes a dollarized Profit Improvement Measure
  • Report card tracks each PIM so the savings stay captured

Dollarized PIM list

Then, if you want it

TOM™

Total Outage Management
End-to-end planning and execution

  • Pre-outage planning, execution and post-outage validation
  • Targets 10% cost and duration reduction across three consecutive outages
  • Cost-to-date and cost-to-finish within four hours of every shift

No surprises at closeout

Then, if you want it

LTSA+™

Long Term Service Agreement Plus
What OEM agreements don't cover

  • Routine maintenance, major overhauls and 24/7 remote monitoring
  • Catastrophic and business interruption cover, arranged through licensed brokers
  • Structured maintenance planning your lenders can budget against

Covered, not just parts-covered

The diagnostic — always step one

Three assets. Three diagnostics. Same discipline.

Nothing gets recommended before it gets measured. Each track has its own entry-point diagnostic, and each one ends the same way — with a dollar figure against every gap and a decision that stays yours.

Opportunities Assessment

For power plants. We compare how your plant actually runs against our 28-process PowerPlantExcellence™ standard, then quantify what the gap is costing you. Every finding becomes a Profit Improvement Measure with a number attached and someone accountable for capturing it.

What you walk away with

A dollarized PIM list ranked by impact, and an OA™ Report Card that keeps tracking each measure after the report is delivered — because savings that aren't tracked quietly come back.

  1. Measure against the standardCurrent operations compared process by process against the 28-process PowerPlantExcellence™ benchmark — fuel, maintenance, labour and compliance.
  2. Quantify the lossesNot "this could be better" but "this is costing you this much per year," with the working shown.
  3. Write the PIMsEach finding becomes a defined Profit Improvement Measure with a dollar target, a timeline and an owner.
  4. Review with ownershipWe agree which PIMs get executed before anyone commits budget.
  5. Report cardProgress tracked against every measure so the improvement is sustained rather than announced.

Published work

The methodology is written down.

PowerPlantExcellence™ isn't a marketing name for a black box. It is a documented operating system — published, in print, and open to anyone who wants to check our work before they hire us.

PowerPlantExcellence by Jay Sikora — book cover

PowerPlantExcellence™

Published 2026 Jay Sikora

The standards, KPIs and preventative-maintenance discipline that replaced a reactive culture at Parkchester, and that every EMP™ has been built on since. It covers how a plant should be measured, how operating decisions should be made, and why the biggest savings in a utility plant almost never come from new equipment.

Read it on Amazon
Powering America: The Era of Innovation by Jay Sikora — book cover

Powering America: The Era of Innovation

Jay Sikora

140 years of the American electric industry — how utilities went from gas lamps and isolated plants to the grid we now operate inside, and what that history says about the choices in front of plant owners today.

Climate Change Is Real, Now What? by Jay Sikora — book cover

Climate Change Is Real, Now What?

Jay Sikora

Jay writes continuously on plant operations, management and engineering practice — including The Power Chronicles series. The full catalogue is on his Amazon author page.

Questions we hear

The five things owners ask first.

We already have an operator.

Good. We don't replace them — we make them better, and we align their work to your budget. Most of what we find is not a staffing problem; it's a problem of nobody being accountable for what the plant costs.

We don't have capital for upgrades.

The EMP™ finds savings before it recommends spending. And under an LTOA™, we fund the infrastructure ourselves at $0 CapEx to you.

What about Local Law 97?

The 25-year roadmap builds emissions targets and compliance costs into every decision — before the penalties arrive, not after. For Mitchell-Lama and other Article 320 properties, the deadline is later than most owners assume, which makes the planning window more valuable, not less.

What if the value isn't there?

We don't take engagements unless we see a path to at least five times our cost. In more than thirty years, we have never seen a fully optimized plant.

How fast do we see real money?

Measurable impact in 60 to 90 days. The first three improvements are typically fully captured within six to nine months.

  • Hospitals
  • Universities
  • Housing
  • Campuses
  • Military bases
  • Airports
  • Manufacturing

Start here

Ten minutes on the phone usually saves a week of digging.

Tell us what your plant is and what's worrying you about it. If we don't see the value, we'll say so on the call.

Opens in your email app so you keep a copy of what you sent. Prefer to just call? 908-770-4955.

References from ownership, management and plant leadership across the portfolio are available on request.

Jay Sikora

Principal

Prefer to put it straight in the diary? Pick a time that works and we will call you.