MicroGrid Services
-
Greenification
Create a cleaner, greener future
Reduce emissions on average by 30%
Ensure compliance with local, state, and federal laws
-
Energy Masterplan
Develop 8760 for electric & thermal loads
Develop 25-year pro forma with all available strategies that identifies CapX, OpX, and emissions
-
Turnkey Design & Construction
Facilitating design, engineering, operations, equipment selection, constructability, schedule, and budget
Guided by Energy Masterplan
-
Long-Term Operating Agreements
De-risk physical plant operation
Stabilize cash flow
Insulate owner from employee risk
Provide equipment & operations insurance to lower owner’s insurance cost